Resealing a driveway is an like shooting fish in a barrel projection and if it's washed right, can better the surface for years and assistance your driveway to last longer. Check the atmospheric condition forecast before you begin this projection, if y'all have 24 to 48 hours of clear skies and temperatures higher up l degrees Fahrenheit, go for it. Avoid doing this project if there is pelting in the forecast.

Step 1: Clean Driveway

Utilise a leaf blower or broom to sweep leaves, acorns and grit from the surface of the driveway. If you have oil stains, a degreaser or primer tin can exist used to help make clean and disguise the stains prior to sealing. Pluck all visible weeds between cracks. If your driveway is shady and prone to growing moss, use a pressure washer to remove it. Apply bleach in a spray bottle to target and kill moss and a scraper to elevator it off the surface. Employ a 15-degree, general-cleaning tip on your pressure washer to completely clean the surface.

Y'all volition need to allow the driveway dry out completely before filling cracks and sealing, but having a make clean surface to work upon will ensure a long-lasting treatment.

Stride two: Patch Cracks and Holes

Yous'll get the best results if you take the time to repair cracks in the surface of the driveway before applying a terminal glaze of sealant. For cracks less than i/2 inch, use a bottle of crack filler. The product has some cocky-leveling qualities (it's very fluid) but avert overfilling the cracks so the patch won't be visible below the finished sealed coat. If y'all do accidentally overfill the scissure, utilize a scraper to level out and spread the filler. Let the filler to dry for 4-eight hours earlier you seal over the top.

For holes or cracks greater than ane/2 inch and with a definitive boundary (due east.g., a hole in the heart of your driveway, non on the border), employ driveway patch and a tamper or the dorsum of a shovel to make repairs. If yous are using driveway patch, it's recommended that you do not seal over the peak of information technology until information technology has cured for 4-6 weeks.

Step 3: Clean Driveway and Mix the Sealant

Once again, if you have 24 to 48 hours of clear skies, this is your fourth dimension to make the driveway shine. Clean the surface of the driveway once again using a broom or a leaf blower.

Mix the sealant buckets one at a time prior to pouring them by tipping them upside downwardly before opening the production.

Footstep four: Seal Edge by Hand

Avoid backing yourself into a corner by working from the meridian of your driveway down towards the end. If the top of your driveway meets a structure, like a garage or a sidewalk, use an old paintbrush to cut in around the border. A squeegee will be good for roofing the main area, merely the edges await nicely finished when brushed with precision.

Step v: Pour Sealant Forth Border

Begin sealing the rest of the cobblestone by pouring a line of sealant along the width of your driveway. Those sealant buckets are heavy, so do your best not to spill excess.

Using the squeegee held at a 45-caste angle, pull and compress the sealant into the surface of the driveway. The sealant, like the cleft filler, has self-leveling qualities, but work diligently and pay attending to how much pressure level you're putting on the squeegee to go on the layer of sealant as even as possible. If you're pushing too difficult, you'll see sealant squeezing over the top of the duster. If y'all're non pushing hard enough, your coverage will stop up being too thick.

Work dorsum and forth across the width of the driveway. Keep to intermission periodically and employ the paintbrush to manually paint in edges that meet structures for a finished expect.

Allow the finished driveway to cure for 24 hours.

Step 6: Employ a 2nd Glaze

When yous look over the dry out sealed surface, y'all may notice that some areas could benefit from a second coat, especially with an older driveway. A second layer will create a stronger seal to protect the surface.

Apply the second coat the same as the first, block off the end of the driveway with the empty sealant containers, and permit the surface to dry for 24 hours before walking on it and 48 to 72 hours before driving on it.